Newton Beach Defences Replacement Scheme IMWA001607

The Purpose

The purpose of the works was to replace the current rip rap protection with a more robust solution that was be able to withstand severe storm surges and tidal events.

Design

The contract was completed ahead of time and within budget despite minimising disruption to local businesses and residents by suspending works for 2 weeks over the busy Easter period.

All material was sourced prior to commencement from nearby quarries within 5 miles to increase the sustainability of the project.

The Works

The works included the design and construction of replacement revetment defences at Newton Beach, Porthcawl.

Contract Value£316,787.18
Contract PeriodMarch to May 2015
Form of ContractNEC3 Short Contract
Grid ReferenceSS836768
AddressBeach Rd, Newton, Porthcawl, CF36 5NE