NPT Recycling
Project consisted of the construction of a reinforced concrete slab for dust extraction apparatus. This would remove dust from within the recycling operation within the adjacent building.
McCarthy's Role
Main contractor on site carrying out/completing all physical works as per the construction details: -
- Install anti siltation measure's downstream of the proposed works
- Construct rip rap causeway in river to access weir
- Divert river around low flow channel in existing weir, this was achieved through the use of Larssen sheet piles driven into the river bed, 1 tonne sand bags, polythene and precast concrete road barriers
- Scabble down the existing concrete weir structure, to provide enough depth for installation of the new arrangement
- Fix new galvanised weir structure
- Concrete pour infill's between existing structure and new weir structure
| Client Organisation | Neath Port Talbot Waste Management |
| Principal Contractor | McCarthy's |
| Contract Period | 2 weeks |