Port Talbot PDR
Stage 2 of the Port Talbot PDR link's the southern end of Stage 1C PDR/Water Street in the Port Talbot Industrial Estate, with the M4 Motorway at Junction 38 (Margam Interchange).
The route continue's parallel with Dock Road up to Oakwood Road and then cross the vacant land parallel to the railway line. The new road crosses the railway at the existing Corus entrance on Cefn Cwrgan Road, following which, it runs south east across the southern area of the Corus Sports and Social club and adjoining fields, then finally to the Junction with the M4 at Margam East.
McCarthy's Work's
C2 West End Relief Culvert
Construction of the C2 lined culvert to provide overflow flood relief to the Ffryd Wyllt river.
- Construction of reinforced concrete lined channel
- Blockstone tie in to piped culvert structure
- Blockstone edge detail to vehicle passing point
- Rip rap scour mattress at outfall point
Swale & Mitigation Pond
- Construction of GCL lined Swale pond
- Construction of GCL lined v-ditch linking into Swale
- Concrete headwall detail to incoming 100mm dia surface water drains
| Client Organisation | Neath Port Talbot CBC |
| Principal Contractor | Costain | Principal Designer | NPTCBC/Arup |
| Contract Period | 5 months |









